Malta Dynamics P-00041-1 I-beam clamp HLL stanchion, front view
$1,331.99
Skip to product information
Malta Dynamics P-00041-1 I-beam clamp HLL stanchion, front view

Malta Dynamics P-00041-1 MD Post I-Beam Clamp Stanchion for Horizontal Lifelines | Canada

$1,331.99

HLL STANCHIONANSI Z359 / OSHA · NOT CSAMODEL P-00041-1

The Malta Dynamics P-00041-1 is the steel I-beam version of the MD Post safety stanchion. It clamps tool-free onto a structural steel I-beam, giving a crew a temporary tie-off point at height before flooring, decking, or permanent fall protection is in place. Each post is sold individually and is the foundation post for a Malta Dynamics temporary horizontal lifeline system.

Malta Dynamics P-00041-1 I-beam clamp HLL stanchion key features

✓Tool-free clamp onto structural steel I-beams
✓Temporary tie-off before decking or permanent protection
✓Foundation post for Malta temporary HLL systems
✓Pairs with P-00147-60 cable assembly

Malta Dynamics P-00041-1 I-beam clamp HLL stanchion specifications

Model P-00041-1
Type I-beam clamp stanchion (MD Post)
Installation Tool-free clamp on structural steel
Sold As Each (single post)
Standards ANSI Z359 / OSHA 1910 and 1926 (per Malta Dynamics) · not CSA Z259
Brand Malta Dynamics

CERTIFICATION — ANSI Z359 / OSHA · NOT CSA

Malta Dynamics lists this product as meeting ANSI Z359 and OSHA 1910/1926 requirements. It is not CSA Z259 certified. If your site or jurisdiction requires CSA-marked fall protection, see our Safety Direct collection; otherwise confirm acceptance with your site safety officer and provincial OHS authority (Ontario MLITSD, Alberta OHS, WorkSafeBC, CNESST) before use.

Malta P-00041-1 I-beam clamp HLL stanchion FAQ for Canadian sites

Is the Malta Dynamics P-00041-1 CSA certified for Canadian sites?

No. Malta Dynamics lists the P-00041-1 as meeting ANSI Z359 and OSHA 1910/1926 requirements; it is not CSA Z259 certified. Many Canadian sites accept ANSI/OSHA-rated equipment, but confirm with your site safety officer and provincial OHS authority before use. If your site requires the CSA mark, see our Safety Direct collection.

How often should the Malta Dynamics P-00041-1 be inspected?

Before every use, and formally by a competent person at least once a year. Remove it from service after any fall or if the inspection finds deformation, cuts, corrosion or other damage.

Ships from Paris, Ontario•Same-day dispatch before noon ET•Canadian dealer support